Utilities Engineer at Mondelez International LLC (Cadbury Nigeria Plc)

  • Want to get a job fast?
    Signup and complete your profile on MyJobMag. Employers will find you 4x faster with a complete profile. You can download your completed profile anytime
    Signup Now

    We make some of the most beloved brands in Nigeria – Cadbury Bournvita beverage, TomTom and Trebor Buttermint confections. We are part of MondelÄ“z International, Inc., a global snacks powerhouse with an unrivaled portfolio of brands people love.
    While Cadbury Nigeria and its brands are part of the MondelÄ“z International family, a por…

    Read more about this company

     

    Utilities Engineer

    • Job Type Full Time
    • Qualification BA/BSc/HND
    • Experience 3 – 5 years
    • Location Lagos
    • Job Field Engineering / Technical&nbsp

    Job Description

    • As expert you will bring a deep technical mastery of the process and equipment.
    • That expertise allows you to lead the planning, process development and implementation of Planned Maintenance Elements in a Continuous Improvement manufacturing environment.
    • You will manage this through teams consisting of various technical and non-technical personnel, key support contractors and operations personnel.

    You Will:

    • Partner & Enable the line leader(s) to deliver the SQCDSM targets-Safety, Quality, Cost, Delivery, Sustainability & Morale for the lines, to ensure Process stability; Participates in the DMS- Daily Management systems meetings at the shift and line level
    • Own the technology and process and centerline settings for the equipment and process and have deep technical mastery of the process and equipment; Owns the PM-Progressive maintenance systems and work processes and the PM-Progressive Maintenance Key Performance Indicators for the line/s along with Centerline Management systems; owns the R&M-Repairs & Maintenance budget of the line
    • Develop, own and execute the line/s preventive and time-based maintenance systems and plans and build capability of the team to execute themselves; Build (spends at least 50% of time) technical and maintenance skills of the technicians working in the shifts, so that they are able to operate and maintain their equipment themselves;  be part of the PM Pillar, own all PM systems and work process at the line level and lead some of them at the department level
    • Partner with the Asset and Reliability team for system improvement and execution of special maintenance tasks; be responsible for Change Management on the line/s, localization of spares and proper break-down analysis and R&M cost reduction for the line/s; Represents the department/line/s as the site technology owner in the regional and global technology forums
    • Assist in VSU for the new initiatives and enable the VSU team; Help the line leader in internal and external benchmarking and reapplication; be the subject matter expert on one of the component categories and be a trainer of PM related subjects for the plant

    What You Will Bring

    • A desire to drive your future and accelerate your career and the following experience and knowledge:
    • Advanced knowledge (including AM-Autonomous Maintenance Step 4 systems & Progressive Maintenance Step 3) & skill to maintain the dedicated equipment(s)at basic conditions independently, including the execution of AM & PM (BD-Breakdown maintenance, planned maintenance) standards on dedicated equipment(s) and TPM – Phase 3 & 4 tools problem solving tools
    • The capability to lead a Role for the Line. Qualify and coach the next level SWP owners and drive the common opportunity areas across the line in PDCA-Plan Do Check Adjust approach
    • The capability to work as the Line Leader, developing and aligning goal/master plan for the line, deploying and managing IDP for the members, coaching team members on their performance management and career development

    Requirements
    Education / Certifications:

    • B.Eng in Mechanical Engineering or Electrical / Electronics

    Job Specific Requirements:

    • 3-5 years working experience on Vapor absorption Chillers, Boilers, Compressors, other utility equipment and PPM on SAP in a multinational company

    Conditions

    • Travel requirements: Non
    • Work schedule: 40 hours/week
    • No Relocation support available.

    Method of Application

    Interested and qualified? Go to Mondelez International on wd3.myworkdaysite.com to apply

    Learn how to get a job in any industry you want. Read 72 Hours to The Job You Love

  • Click Here to Leave a Comment Below 0 comments